De-risking & compliance architecture
- Technical feasibility audit and database schema definition
- Regulatory architecture mapping (HIPAA, SOC2, PCI-DSS)
- Clickable low-fidelity wireframe walkthrough
- Repository provisioned with CI/CD scaffolding
One dedicated senior pod, a locked deliverable at every stage, and the same engineers behind both sides of this studio — our own ventures and the client builds we take end to end. You own the repository, the infrastructure, and the IP.
Techdome acts as your technical co-founding team. Whether launching an internal spinout or co-founding a venture with domain leaders, we combine institutional software architecture with rapid, milestone-driven execution.
A Principal Architect, Senior Full-Stack Engineers, and QA deployed exclusively to your build from Day 0. No junior churn, no hiring lag, and no body-shop friction.
From blank repository to first paying customer in eight weeks. Weekly sprint demos against running code, locked deliverables at every stage, and zero open-ended billing.
Your repository, your cloud infrastructure (AWS/GCP), and your IP from Day 0. Day-zero compliance architecture for SOC 2, HIPAA, and PCI-DSS without expensive rewrites.
A full 0-to-1 build runs in 8 weeks; fixed-scope sprints run 2 to 4 weeks
Week 1
System Architecture, Data Schema & Risk Matrix
We audit technical feasibility, lock compliance requirements (HIPAA/SOC2), design relational database models, and create interactive UX wireframes.
Week 2–3
Working Backend API & Cloud Infrastructure
We provision cloud infrastructure, configure zero-trust authentication (OIDC/SAML), and build core business logic and third-party API adapters.
Week 4–6
Complete Feature-Complete Staging Application
We connect high-performance frontend interfaces with automated backend workflows, payment processing, and internal operational dashboards.
Week 7
Pen-Test Review, WCAG 2.2 AA Audit & Load Tests
Exhaustive automated testing, accessibility auditing, vulnerability scanning, and end-to-end user scenario validation under high concurrency.
Week 8+ — end not fixed
Live Production URL, CI/CD Pipelines & Telemetry
DNS cutover, real-time APM telemetry instrumentation, staff enablement training, and structured handover to ongoing growth pod or internal team.
Every week ends in a demo against code that runs in staging — not a slide deck. You review commits, test live features, and verify acceptance criteria weekly.
Milestone-based models and committed windows, never surprise hourly invoices or junior staffing.
We're not a resume-forwarding agency — the engineers we place are the engineers who build our own ventures.
From blank repo to first paying customer — a time-boxed sprint with defined deliverable and duration.
The same pods have shipped vision models onto a factory floor, voice agents onto live telephony, and lending workflows under RBI rules. Explore our domain capability records:
Not client work, and not slideware — run on our own capital, pods and on-call rotation.
Open-source API testing, mocking and debugging suite
AI technical screening and video interviewing
Conversational voice AI agents
Digital Loan Enablement & Intelligent Credit Advisory Platform
Advanced Data Analytics & BI Software · SEO & GEO Intelligence Platform
Venture and engineering pod operating system
AI-powered industrial intelligence platform
Not testimonials. Shipped systems, described by industry and geography, with the delivery dates and the architecture written down.
Also on the record
Proposal to a pod on the repo in eight days — then a re-platform off a failing low-code stack without taking the clinic down.
Proposal to Kickoff
Won in two and a half weeks, and the follow-on scope was approved thirteen days after the first milestone.
Deal to Kickoff
The fixed-scope sprint run for real: a blank repo to a production GraphRAG platform, not a demo.
Delivery Time
Every engagement we won this year was signed between two and twenty days after the final proposal.
All eight records in the portfolioStraight answers on timelines, sprint pricing, compliance, and IP ownership.
A full 0-to-1 build runs on our 5-step Blueprint and typically reaches production in about eight weeks — architecture and compliance in Week 1, through to DNS cutover and telemetry at launch. A Fixed-Scope Sprint against a narrower brief is 2–4 weeks. Either way, every stage carries a locked deliverable and a stated window before work starts.
Bi-weekly engineering notes on 0-to-1 venture validation, 8-week MVP blueprints, and startup architecture.
One call is enough to tell you whether the blueprint fits what you are building, what the first eight weeks would actually contain, and where we think the risk sits. If we are the wrong team for it, you will hear that instead.
Or you may be on the wrong page
You talk to a senior architect, not an account manager. Mutual NDA and IP assignment as standard.